Trinity County HBP Bridges Design-Build

2018 | Transportation | Best in Small Projects | National Award of Merit

Design-Build Team Summary

Challenge Design-Build Project Delivery Addressed

The design-build team, facing the challenge of replacing five bridges, many in remote mountainous areas, used their knowledge and experience to innovate and complete the project efficiently and cost effectively. For the four most remote structures, they used a composite precast/prefabricated design reducing the need to bring raw materials on-site, over narrow rural roads and possibly damage the environment.

Summary

The R N R Construction and Dokken Engineering team replaced five County-owned bridges which were identified as structurally deficient or functionally obsolete. The design-build team selected a composite precast/prefabricated design for four of the most remote structures, thereby reducing the need to bring raw materials on-site. The replacement bridges have been designed to current seismic and structural design standards. Minor approach work enhanced curvature and sight distance lines. All work was completed in 12 months.

Design-Build Team

Client/Owner: Trinity County DOT
Design-Builder, Project Manager, General Contractor: R N R Construction, Inc.
Engineer: Dokken Engineering
Specialty Contractor: Verux
Specialty Consultant: Geocon Consultants, Inc.
Duration of Construction: 4 months
Project Cost: $6,667,500