Restoring this historic bridge to accommodate modern traffic, retain its appearance and without disturbing surrounding (also) historic buildings and modern utilities was a challenge. Discoveries such as a void resulting from a leaking pipe (which had to be repaired) and contaminated soil required innovation by the design-build team. It took extensive coordination and teamwork to complete this project, which was delivered 49 days ahead of schedule.
Learn MoreFlorida DOT
2019
Transportation/Aviation
Main Street Bridge (Duval County) Historical Renovation Project (SR 5)
Florida DOT