Grady Memorial Hospital Bed Expansion

2024 | Healthcare Facilities | National Award of Merit
Atlanta, GA

Design-Build Team Summary

Photo Credit: Gregg Willett Photography

Due to the unexpected closing of a nearby hospital, Grady Memorial Hospital anticipated a dramatic need for ICU beds and needed to act quickly. The Grady Memorial Hospital Bed Expansion project, completed in just eight months, exemplifies the seamless collaboration and expedited decision-making across the design and construction phases that design-build excels at, setting a new benchmark for the potential timeline for delivery of healthcare facilities. The project added two state-of-the-art, 26-bed critical care units on the ninth and tenth floors of Grady Memorial Hospital, significantly enhancing the hospital’s capacity to provide specialized care.

Remarkable Delivery Speed Without Sacrificing Innovation

The accelerated project schedule did not come at the cost of innovative, creative solutions. The hospital expansion utilizes a vacuum pump plumbing system, a pioneering solution that eliminates floor penetrations into lower floors. By relocating waste lines to the ceiling instead of below the floor, this innovation prevents leaks and potential contamination of patient rooms on lower floors and provides a more efficient means of identifying and resolving clogs. The result is a system that minimizes maintenance challenges, promotes environmental sustainability by reducing water wastage and, most importantly, protects the health of patients and visitors.

The installation of patient lifts in every room minimizes the risk of staff injuries by providing a mechanical means of transferring patients, reducing physical strain on healthcare workers and enhancing patient safety. The design of the rooms also accounted for visibility and accessibility, allowing for constant patient monitoring and quick medical response.

These features reflect the design-build team’s holistic consideration of both patient care and the well-being of the healthcare professionals. And through its innovative design and construction, the Grady Memorial Hospital expansion not only addresses immediate healthcare needs but also inspires other institutions by showcasing what can be accomplished with design-build in the healthcare industry.

Design-Build Team

Client/Owner:Grady Memorial Hospital
Design-Build Firm:The Beck Group
Architects:Beck Architecture; PF&A
Engineers:Uzun & Case, LLC; WSP USA; J&A Engineering
Specialty Contractors:Peachtree Mechanical Inc.; Miller Electrical Contractors; Mitec, A Pye-Barker Fire & Safety Company; EAB360; DCO Commercial Floors
Project Cost:$30,286,825
Construction Duration:8 Months