HB 5479: Progressive Design Build Pilot Program Act
Introduced: 2/9/24 by Kevin Olickal (D-016)
Summary:
Creates the Progressive Design-Build Pilot Program Act; provides that the Capital Development Board may elect to use the progressive design-build delivery method; provides that progressive design-build delivery method means a project delivery process in which both the design and construction of a project are procured from a single entity that is selected through a qualifications-based selection at the earliest feasible stage of the project.
Last Action: Apr 30, 2024: In SENATE. Rule 2-10 Committee Deadline Established As May 10, 2024.
DBIA Position: Support