One of the hallmarks of design-build project delivery is early knowledge of costs. This course introduces the fundamentals of conceptual estimating and how to go about assessing risk and calculating costs before design is complete. (6 CEUs)
At the end of the course students will be able to:
- Describe the role of the estimator in design-build
- Describe the various influences affecting building costs
- Describe the various types of estimates
- Describe how estimates are organized using standard estimating formats
- Explain how to use an estimating manual
- Describe how unit prices are developed
- Explain the fundamental concepts of value engineering
- Explain how to manage and control costs throughout the design process
- Describe the various checks and balances needed to ensure the reliability of the estimate
Venue:
KTA-Tator, Inc
115 Technology Dr
3rd Floor Training Room
Pittsburgh, PA 15275
Format: In-Person
Pricing
Owner Member: $275
Owner Non-member: $375
Practitioner Member: $375
Practitioner Non-Member: $675
Federal Schedule
View our GSA pricing and register here.
Schedule: February 18, 2020
Location: Pittsburgh, PA
Venue: KTA-Tator, Inc
Address:
115 Technology Dr3rd Floor Training Room
Pittsburgh, PA 15275
Format: In-Person