U.S. Coast Guard Houston — Galveston Sector Building
Challenge Design-Build Project Delivery Addressed The wide variety of functions and user groups housed in this building required an extensive amount of technical/operational coordination, for which design-build was the ideal delivery […] -
P-822 MCAS Terminal Operations & AFRS Complex
Challenge Design-Build Project Delivery Addressed NAVFAC continues to be pressured to do more with less. Use of the design-build process saves significant time/costs and promotes innovation and improved quality. Summary […] -
Lawton Valley and Station No. 1 Water Treatment Plants Design-Build
Challenge Design-Build Project Delivery Addressed On this project, both sites had elevated levels of arsenic in soils. The joint-venture (JV) conducted comprehensive sampling and soil characterization to define the limit […] -
Old Main Renovation
Challenge Design-Build Project Delivery Addressed The design-build renovation of Old Main maximized cost-effective rehabilitation balanced with preservation of historical integrity and new programmatic functions on a fast-tracked schedule. Due to […] -
United States Cold Storage Distribution Center
Challenge Design-Build Project Delivery Addressed The aggressive schedule of this project could not have been achieved within the timeframe allotted without the design-build delivery method. Timing was so critical, many […] -
University of Washington Tacoma — YMCA Student Center
Challenge Design-Build Project Delivery Addressed While building just one facility, there were two owners with different program needs. The team jointly created a Collaboration Guide that clearly outlined project goals […] -
Mission Hall: Global Health and Clinical Sciences Building
Challenge Design-Build Project Delivery Addressed The University of California, San Francisco (UCSF) chose design-build because of the 24-month timetable for design and construction of their facility. The ultimate plan emulated […] -
County of San Diego Waterfront Park and Parking Structure
Challenge Design-Build Project Delivery Addressed Design-build allowed the project team to encounter and handle various unforeseen on-site challenges while maintaining schedule. The County utilized the design-build process to facilitate collaboration […] -
St. Jude Medical Center Northwest Tower
Challenge Design-Build Project Delivery Addressed The owner chose design-build delivery to lower the overall design and construction cost and to bring a heightened level of accountability to the design phase. […] -
I-485/I-85 Turbine Interchange
Challenge Design-Build Project Delivery Addressed Design-build afforded Lane/STV the ability to propose an alternative technical concept (ATC) for a modified interchange, saving $30 million and eliminating any private financing, with […]