Posts for Archives: Project
-
UCSF Wayne and Gladys Valley Center for Vision
UCSF’s Wayne and Gladys Valley Center for Vision in San Francisco provides a home for academic and scientific initiatives near other complementary UCSF programs. This LEED Gold® 347,500 SF design-build/IPD project is the first building for UCSF’s East Campus. It’s one contiguous structure composed of two distinct components: a 12-level academic tower and a five-story […] -
United Airlines Catering Operations Kitchen
This project entailed the conversion of a 153,000 square feet vacant storage space into a food catering operation for United Airlines in Newark, New Jersey. The design-build team transformed United’s new warehouse space into an all-inclusive food handling, preparation, and refrigerated catering facility. New food safety standards were also created to not only protect customers […] -
University of California, San Diego Nuevo West Graduate Student Housing
The University of California, San Diego Nuevo West Graduate Student Housing is a $151 million mixed-use residential community that totals 441,788-square-feet within two residential buildings and a market. The Nuevo West residential community provides a total of 884 new beds for graduate students and families of patients being treated at the nearby UCSD Medical Center. […] -
University of Washington Hans Rosling Center for Population Health
The University of Washington received a large grant for an important health research initiative seeking solutions to benefit the world’s population and needed a new highly collaborative work environment. The design-build team’s mission was to create a high-quality, high-performance facility within a short amount of time on a fixed grant budget while balancing many institutional […] -
University of Washington Parrington Hall
The 1902 historic Parrington Hall project is a $19M progressive design-build renovation included reconfiguring the 56,000 SF four-story classroom space. The Daniel J. Evans School of Public Policy & Governance and the University sought to renovate Parrington Hall to improve the student, faculty and staff experience by providing a variety of teaching and learning spaces […] -
US 15 over Indian Field Swamp Bridge Replacement Project
This design-build project included the replacement of the structurally deficient and load restricted, fixed-span US 15 Bridge over the Indian Field Swamp in Dorchester County, SC. The overall project totaled 1,390 feet including the new 120’ LF bridge that was built within the same footprint as the existing bridge. The team’s approach included a resource-intensive […] -
UW Harborview Medical Center Hybrid Bi-Plane OR
Photo Credit: Aldrich + Associates, Inc. As Washington’s only Level 1 trauma center, the UW Medicine Harborview Medical Center needed to create a hybrid operating room with bi-plane imaging equipment. The challenge – the new BPOR was to be constructed in the middle of an active operating theater in the basement level of a 24/7 […] -
WYMD General Instruction Building
The WYMD General Instruction Building (GIB) project includes the design and construction of three new facilities spanning over 110,000 SF. These facilities support the Wyoming Military Department’s position as a premier Joint Training Center. The GIB has more than 78,000 acres of maneuver area, training ranges, and 64 square miles of air space this facility […] -
Yerba Buena High School Student Union
Photo Credit: Travis M. Turner Photography The vision for Yerba Buena High School’s Student Union was to create a “paradigm change” to unite students, staff and administrators in human-centered environments that create a hub for academic, social and community inspiration. That vision was achieved with this 37,150-square-foot build that houses several different user groups and […] -
Cutter Lateral Reach 21 Water Treatment Plant and Associated Items, Navajo Gallup
This was the U.S. Bureau of Reclamation’s first water/wastewater design-build project and addresses a critical water shortage in the Navajo and Jicarilla Apache nations. Congress appropriated $1.5 billion for this 3.5-MGD greenfield project – which involves the treatment and conveyance of water from Cutter Reservoir – will provide a clean, reliable, and long-term water source […]