SR-520 Evergreen Point Floating Bridge and Landings Design-Build Project
Challenge Design-Build Project Delivery Addressed The Washington State Department of Transportation (WSDOT) considered traditional delivery options but decided that the design-build model was a perfect fit for this project because […] -
Veterans Memorial Bridge
Challenge Design-Build Project Delivery Addressed The owner chose the design-build project delivery primarily to meet the short schedule required to qualify for federal American Recovery and Reconstruction Act (ARRA) funding, […] -
Claude “Bud” Lewis Carlsbad Desalination Plant
Challenge Design-Build Project Delivery Addressed Poseidon Water used the Fixed Price Design-Build delivery model to ensure financial viability of the project and provide performance-based guarantees on water quality, quantity, power […] -
Clifton Water District Microfiltration/Ultrafiltration Water Treatment Plant
Challenge Design-Build Project Delivery Addressed The Owner saw three main challenges with this project: The only delivery method that could possibly accomplish those goals was design-build. Summary The Clifton Water […] -
Davis-Woodland Water Supply Project
Challenge Design-Build Project Delivery Addressed To address long-term drought conditions and solve water supply challenges for two California cities, the Davis-Woodland Water Supply Project highlights how design-build delivery achieved significant […] -
The Wichita Equus Beds Aquifer Storage and Recovery Program, Design-Build Surface Water Treatment Plant and River Intake
Challenge Design-Build Project Delivery Addressed As the most complex element of the ASR Program, the Surface Water Treatment Plant (WTP) and River Intake was on a critical path. With eight […] -
Liberty Utilities and Wastewater Treatment Facilities
Challenge Design-Build Project Delivery Addressed Liberty had been outsourcing treatment since the 1980’s. Increasing and unpredictable outsourcing costs proved to be unsustainable. Liberty quickly determined that building their own treatment […] -
Sisters Creek Bridge Replacement Design-Build
Challenge Design-Build Project Delivery Addressed FDOT has extensive experience using the design-build delivery method and FDOT District 2 has helped champion many complex projects using a two-phased, best value selection […] -
Dallas Horseshoe Design-Build
Challenge Design-Build Project Delivery Addressed TxDOT chose design-build delivery to capture these benefits: Summary TxDOT needed to rapidly replace two Interstate bridges over the Trinity River in downtown Dallas and […] -
Rehabilitation of Four Bridges, Route 8, Bridgeport, Connecticut
Challenge Design-Build Project Delivery Addressed CTDOT carefully considered the chosen project for its first design-build project. It had to be complex enough to promote the innovation that design-build propagates, yet […]